How much does a website cost?








How long does a website take? The honest answer most agencies won’t give you.

Sherry Jacobi, CEO and Studiothink Blog Author and Writer

Sherry Jacobi


Sherry Jacobi is the powerhouse entrepreneur and visionary founder of Studiothink, a company she started in 1997, building it into one of Canada’s leading website and branding agencies.

I’m going to open with a truth bomb.

At Studiothink, websites take a minimum of 12 to 16 weeks from kickoff to launch, and can be even longer, depending on size and complexity.

This timeline shocks a lot of people, but we see it time and time again. The agency that tells you it will take less time is an agency who doesn’t know the complexities of building out content for team pages, product pages, showcases, email forms, and much more.

We would rather you know upfront.

Now, to be fair and a little less scary, that timeline assumes a few things that are entirely within your control. When things go magically right, we can get done quicker. But when those things go sideways, 12 weeks becomes 20 weeks, nobody is happy, and the launch gets postponed indefinitely.

And no one likes a postponed launch.

So, let’s talk about what actually determines how long your website takes.

What is included in the website timeline?

A well-run website project moves through several distinct phases, and at Studiothink our process has a set timeline for each one.

Discovery and strategy come first. This is where we get inside your business, your audience, your competitors, and your goals. It is the phase most companies want to skip and the phase that determines whether everything that follows actually works.

After that, UX design and prototyping happens. Before a pixel of visual design gets created, we prototype the user experience so you can review and approve the structure, the content hierarchy, and the user journey before committing to final design. This saves enormous amounts of time later and produces significantly better results.

Visual design follows. This is where the website starts to look like your brand and feel like somewhere worth spending time.

Copywriting and brand story run alongside and immediately after design is approved. If you have hired Studiothink to write your copy, our strategists and writers develop the content in parallel with the visual design, so both are ready to go into development together. If you are providing your own content, this is the phase where it needs to be in our hands. We offer copywriting as part of our website packages because we know that waiting for client content is the single most common reason projects run late.

Development is next. Our in-house developers build your site to perform, integrating your CMS, any third-party tools, eCommerce if needed, and WCAG AA accessibility standards as a baseline rather than an afterthought.

Then testing, revisions, and launch. Which all take time to prepare properly.

Why do websites take longer than expected?

Almost always because of the same three things.

Content. The single most common reason a website project stalls is that the client has not provided copy, photography, or video by the time the design team needs it. Content is not something you prepare after the design is done. It shapes the design from the start. If you do not have it ready, the project waits.

Feedback delays. Every week a revision sits in an inbox waiting for approval is a week added to the timeline. The agencies that consistently hit their timelines are the ones with clients who prioritize their reviews. The agencies that consistently run late almost always have clients who do not.

Scope changes. Adding a new section, a new feature, or a new integration after the project has started is not a small thing. Every addition gets assessed, priced, and scheduled. Mid-project scope changes are the fastest way to push a launch date.

None of this is a criticism. It is an honest description of where timelines actually go. The companies that launch on time are the ones who come prepared.

What can I do to make my website project faster?

Three things that make the biggest difference.

Have your content ready before the project starts. Or, budget to have us write it for you. Studiothink provides copywriting as part of our branding and website packages precisely because we know that waiting for client content is the number one project killer.

Designate a single point of contact on your side. Nothing slows a project down faster than feedback that has to be collected from five stakeholders with conflicting opinions and no clear decision-maker. One person with authority to approve speeds everything up.

Respond to reviews within the agreed timeline. We give you a clear schedule for when reviews are due. Treat those dates the same way you would treat a customer deadline.

One final recommendation.

We have found that the clients who have a set deadline are the ones who get things done faster. Having an event, trade show, or product launch will help you stay on track with content delivery and approvals. We always tell our clients we can move as fast as they can.

A website launch is kind of a big deal, and we know how important it is for you. Let’s get it done.

How long does a website redesign take compared to a new website build?

At Studiothink, the timeline is similar. A website takes 12 to 16 weeks depending on scope. The discovery and strategy phase may move faster if we have existing brand assets to work from, but the design, development, and testing phases take the same time regardless.

How long does a branding project take before the website starts?

A branding project at Studiothink takes 6 to 8 weeks. If you are doing both brand and website together, the total timeline is typically 16 to 20 weeks, with brand completed before website design begins so the site reflects your finished identity.

Can a website be built faster than 12 weeks?

Yes, but it depends on the scope and the readiness of your content. Simpler sites can move faster. A complex custom website with multiple integrations, eCommerce, or significant content needs the full timeline to be done properly.

What slows down a website project the most?

Content delays are the single biggest factor. Followed by slow feedback turnaround and mid-project scope changes. The projects that launch on time almost always have clients who came prepared with content and respond to reviews quickly.

How long does a website last before it needs to be redesigned?

Most websites need a significant update every three to five years. Technology changes, your brand evolves, user expectations shift, and search algorithms update in ways that affect how your site performs. A well-built site with a strong content strategy can remain effective longer, but no website is a set-and-forget investment.